Multi-Family



Image
THE HUB-FLAGSTAFF, AZ
A 660-bed student housing complex in downtown Flagstaff, AZ. Expected completion date August 2018.



THE HUB-FLAGSTAFF
Image
RISE AT RIVERFRONT CROSSINGS-IOWA CITY, IA
A 572,000-square-foot mixed-use development in downtown Iowa City, Iowa, which will offer a 15-story residential...
Rise (Iowa)
Image
RISE ON APACHE-TEMPE, AZ
631,000 square foot 15 story student housing project has completed at the beginning of the 2017 school year. The project includes...


RISE ON APACHE
Image
THE HUB-TEMPE, AZ
430,000 square foot 19-story student housing high-rise building consisting of 269 luxury apartments. Extensive amenity areas include a 25,000 square foot outdoor deck with pool,..



THE HUB
Image
UNIVERSITY HOUSE PHASE II-TEMPE, AZ
128,000 square foot 18 story addition to the original phase including 72 apartments. Beal Derkenne Construction self performed the the structural concrete...

UH II
Image
LATITUDE-LINCOLN, NE
431,000 square foot 6 stories over below grade basement parking garage structure consisting of 199 apartments and 573 bedrooms. The project included 10,000 square feet of retail space and...
LATITUDE
Image
SOCIAL 28-GAINESVILLE, FL
2 buildings covering 290,000 square foot, 169 apartments spanning 6 stories each. This project featured an amenity deck...
SOCIAL 28
Image
HYATT HOTEL-IOWA CITY, IA
A 14-story, 151-key Hyatt Place hotel, located in Iowa City, IA.



HYATT
Image
PARK AVENUE-TUCSON, AZ
250,000 square foot 13-story high-rise student housing building over a 2.5 story sub-terrain garage. The project...


PARK AVE

THE HUB-FLAGSTAFF, AZ


A 660-bed student housing complex in downtown Flagstaff, AZ. Expected completion date August 2018.

RISE AT RIVERFRONT CROSSINGS-IOWA CITY, IA


A 572,000-square-foot mixed-use development in downtown Iowa City, Iowa, which will offer a 15-story residential tower with 332 fully furnished, market-rate apartments, as well as a 14-story, 151-key Hyatt Place hotel, close to the University of Iowa. Completed summer 2018.

RISE ON APACHE-TEMPE, AZ


631,000 square foot 15 story student housing project completed at the beginning of the 2017 school year. The project includes 384 apartments with 833 bedrooms along with three separate roof top amenity decks featuring a pool deck on level 15. There is 5,000 square feet of retail on the ground floor along with sports court, fire pits and BBQ's on the amenity decks.

THE HUB-TEMPE, AZ


430,000 square foot 19-story student housing high-rise building consisting of 269 luxury apartments. Extensive amenity areas include a 25,000 square foot outdoor deck with pool, spa, cabana area, volleyball court, fire pits and lounge areas. This project achieved LEED certification. 2013 ENR Southwest Best Residential Project 2014 RED Award Large Multi-Family Project of the Year 2014 Multi-Housing News Best New Development 2014 Student Housing Business Innovator Awards (2)

UNIVERSITY HOUSE PHASE II-TEMPE, AZ


128,000 square foot 18 story addition to the original phase including 72 apartments. Beal Derkenne Construction self performed the structural concrete and framing/drywall scopes. This project achieved LEED accreditation.

LATITUDE-LINCOLN, NE


431,000 square foot 6 stories over below grade basement parking garage structure consisting of 199 apartments and 573 bedrooms. The project included 10,000 square feet of retail space and a 25,000 square foot outdoor amenity deck with pool, spa, sports courts, fire pit, BBQ's and pergolas.

SOCIAL 28-GAINESVILLE, FL


2 buildings covering 290,000 square foot, 169 apartments spanning 6 stories each. This project featured an amenity deck, luxury pool, spa, workout facilities and library.

HYATT HOTEL-IOWA CITY, IA


A 14-story, 151-key Hyatt Place hotel, located in Iowa City, IA. Project completed summer 2018.

PARK AVENUE-TUCSON, AZ


250,000 square foot 13-story high-rise student housing building over a 2.5–story sub-terrain garage. The project consisted of 166 apartments and rooftop pool.
" Work Hard, Play Hard"
- Beal Derkenne Construction -